References from the field of geothermal energy
Since the end of the 1990s, the H.S.W. GmbH dealt with applications of near-surface geothermal energy as a part of applied geology. Even back in the days of relatively low energy costs, the potential of geothermal energy was recognized and a separate department "geothermal energy" has been created in 2003. The extensive experience of numerous successful industry and research projects speak for the exceptional skills of H.S.W. GmbH in the design of geothermal systems. National and international references of this department include the implementation of nearly 500 geothermal response tests as well as the design (including calculations, plans, professional accompaniments) of more than 1,000 different geothermal projects.
The following references provide a selection of successfully realized projects:
2013
Exploratory drilling, GRT, approval planning and design for the new headquarters of Jungheinrich AG in Hamburg, size: 50 geothermal probes with a depth of 100 m
2010 und 2013/14
Approval planning and construction management for a geothermal probe field with 100 geothermal probes for the federal ministry of the interior in Berlin
2013
Feasibility study for geothermal heating and cooling of the currently planned HSV-campus next to the IMTECH ARENA, client: HSV-Arena GmbH & Co.KG
2013
Research on the regional geothermal potential of the hanseatic city of Rostock and transfer into a GIS-based map, client: Hanseatic city Rostock
2013
Analysis and evaluation of geothermal measurements (GRTs) in the federal state of Mecklenburg-Vorpommern. The results are used to refine and update the existing datasets and deliver input data for a geothermal information system, client LUNG MV
2012
"AIDA HOME", administrative building in Rostock, 210 kW thermal extraction power and 320 kW thermal injection power, subsequent replanning from 340 energy piles + 30 geothermal probes to 38 geothermal probes with a uniform depth of 100 m
2012
Construction of the hospital “Wesermarschklinik” in Nordenham; preliminary planning, GRT, design; 219 energy piles for a total of about 800 MWh/a extraction and injection capacity
2012
Residential and commercial building "ALEA 101" in Berlin, geothermally activated slotted wall with a length of 217 m, GRT, 3d FEM simulation, 60 kW extraction and 30 kW injection rate
2012
European Space Operations Centre in Darmstadt, “Project Callisto", GRT, design and 3D FEM simulation, borehole heat exchanger field, 225 kW heating and 245 kW cooling system
2012
Fraunhofer Institute for manufacturing technology and applied materials research in Bremen, GRT, potential calculation for a geothermal probe field, 220 kW heating and cooling
2011 - 2012
Supermarket “Edeka” in Großhansdorf, GRT, design, construction supervision, borehole heat exchangers as part of a geo-cooling and -heating system
2011 - 2012
“ZMF”, part of the university hospital in Rostock, preliminary planning as a geo-cooling and -heating system, 105 borehole heat exchangers, 150 m deep, 700 kW heating and cooling
2011 - 2012
SAP, new office and commercial building in Hamburg, preliminary planning and design, 3D-FEM simulation, 55 geothermal probes, 120 m deep, 325 kW heating and cooling
2011
Museum of Fine Arts in Ahrenshoop, GRT, preliminary planning, design, construction supervision, 24 geothermal probes with 99 m depth, 100 kW heating capacity
2011
“Neue Gartenstadt Falkenberg” in Berlin, urban living resort, design and construction management, 3D-FEM simulation, borehole heat exchanger field with an integrated district heating network, 30 geothermal probes with 99 m depth
2011
Administrative district OVP, geothermal cooling of the data center, approval planning and design, site supervision, 9 borehole heat exchangers with 99 m depth
2011
Thermal well system for the appartement house "Strandläufer" in Warnemünde, planning and construction management, heating + cooling with 80 kW of thermal power
2006 - 2011
“Geothermal bridge” in Berkenthin, geothermal heating and cooling system for the road surface with a complex monitoring and regulation system, fed by a thermal extraction well, preliminary study, planning, construction supervision, monitoring of the operation
2010
City Palace / Humboldt Forum in Berlin, potential study, design of a combined source system including energy piles and borehole heat exchangers for 750 kW heating and 250 kW cooling power
2010
"Boulevard Berlin", commercial building, GRT and all planning stages for 132 borehole heat exchangers with a depth of 99 m, 1 MW heating power , 650 kW cooling power
2010
University of Alcala in Spain, 60 borehole heat exchangers à 100 m, GRT and design, 250 kW heating and cooling
2010
Parliament of the federal state of Brandenburg, Potsdam, GRT, energy piles and geothermal probes, planning, performance calculations for different utilization variants
2010
Living quarter “Harburger Schlossinsel", Hamburg, preliminary planning, design of the geothermal source system, energy piles + borehole heat exchangers, 260 kW heating power
2009
Airport of Zagreb in Croatia, GRT and dimensioning of the borehole heat exchanger field, 150 kW heating + cooling power
2009
Air force base Avord in France, GRT and thermal simulation of a bore hole heat exchanger based system with 200 kW cooling demand
2009
Headquarters of “Rossmann” in Burgwedel, planning, numerical 3D-FEM simulation, 200 kW heating and 300 kW cooling, 68 borehole heat exchangers
2009
Kreissparkasse “Geesthacht”, office building, all planning stages and construction management, 3D-FEM simulation for 35 borehole heat exchangers, 200 kW heating + cooling
2009
“REWE” supermarket, Berlin, GRT, planning, 3D-FEM simulation, approximately 60 kW heating and cooling
2008 - 2009
Federal ministry of the interior, Berlin, potential study for thermal use of the ground, GRT and 3D-FEM simulation
2008
"Wohnen in den Wannseegärten", urban living resort in Berlin with 77 houses, GRT, 3D-FEM simulation, borehole heat exchangers for 0.5 MW heating power
2008
IKEA building in Berlin-Lichtenberg, preliminary studies for an energy pile system, GRT,
2008
“Conergy AG”, thermal well installation in Rangsdorf (close to Berlin), detailed design and construction supervision, 300 kW thermal power demand, 3D-FEM simulation
2007
Chamber of Commerce and Industry in Schwerin, "Ludwig-Bölkow-Haus der Wirtschaft", 218 energy piles, planning and construction management, 3D-FEM simulation, 120 kW heating + 230 kW cooling
2007
“Conergy AG” in Bremerhaven, industrial production hall, energy piles, preliminary planning and detailed design, thermal simulations, 300 kW heating + cooling
2007
State Museum in Schwerin, geothermal cooling by thermal wells, detailed design, 3D-FEM simulation and construction supervision, 200kW cooling power
2007 - 2009
UN Convention Center in Bonn (UNCC), thermal well doublet for 1 MW of geothermal power, heating + cooling, all planning stages including 3D-FEM simulation
2006
National Convention Center in Hanoi, Vietnam, geothermal well, detailed design, planning and accompaniment of the relevant exploration work, 3D-FEM simulation and construction supervision
2002 - 2005
Silo 4 + 5 in the city harbor of Rostock, planning and construction management of the energy pile system and thermal surface water use for 264 energy piles, 200 kW extraction power
2002 - 2004
University Library in Rostock, design and construction management of a borehole heat exchanger system (32 pieces), 3D-FEM simulation, 60 kW heating + cooling